

A couple of small rigg upgrades
After we mounted the new furling system and genoa we thought it could be nice, by the looks but also to the new sail, to upgrade our...


Tiller - refurbished
Our tiller to the rudder just received some well needed attention. During the winter we brought the tiller inside and painted it with...


New genoa and furling system
Last summer our genoa (from 1970's) got ripped apart. When we started looking into replacing the genoa we also thought it could be a good...


New brass bushings, ball valves etc.
Last year I (CJ) accidently broke off the handle to the starboard ball valve when I tried to open it after the winter. Before this years...


New engine mount
The old engine mount had been through enough and we needed to replace it. The wooden plate was almost rotten and the hight adjustment...


New electrical system
During spring 2015 we went through and replace the boats electrical system. All the cables was replaced and routed trough plastic pipes...


Hull renovation - 4 layers of epoxy
First off we blasted the hull with dry ice right after the boat was on the port once again. Every layer of old paint was removed until we...


New cushions
One of the first projects we did was to create and sew new cushions. We chose a fabric called "Dralon" at Stoff & Stil wich was water...


Insulating the inside of the hull
To make it a bit more fresh and comfortable within the boat we replaced all the old hull insulation with a new thicker one. The...